Government building in Pristina, Kosovo

Electrical engineering: A strong pressure wave was triggered by the sashing of a Cruise Missiles rare in a neighboring building, which severely damaged the OSCE's main government in Pristina. Fallen ceilings and destroyed interior walls required a complete renovation, which had to be done both quickly and cost-effectively. All Engineering will take over the complete new installation of the electronic equipment as required, quickly and cheaply. The All Engineering team had to face major challenges mainly because of the destroyed infrastructure and the effects of the war.

  • Project: Government building – South wing in Pristina

  • Client: OSCE (Organization for Security and Co-operation in Europe)

  • Description: Complete electrical planning and execution

  • Construction start: 2000

  • Construction time: 6 months

  • General constractor: Co. Bautech GmbH

  • All Engineering Contract: Complete reinstallation of the electrical engineering of the building destroyed by the pressure wave of Cruise Missiles.

  • Special features: Since the nearby building was hit by American Cruise Missiles, all windows in this building were destroyed. The entire suspended ceilings have fallen, partly also the interior walls. In this debris desert,
    All Engineering has carried out a cost-effective complete renovation.