green trees in glass building

German embassy in Sofia

Electrical engineering:
For the German Foreign Ministry, All Engineering renewed the ceiling lighting at the German Embassy in Riga, Bulgaria. During the execution of the work, the ongoing operation in the already active embassy should not be disturbed

  • Project: German embassy in Sofia

  • Description: Renovation of the embassy building

  • Client: German Foreign Ministry

  • Construction start: 15. September 1997

  • Construction time: 6 weeks

  • General Constructor: Co. Bautech GmbH Uetze

  • All Engineering Contract: Renovation of ceilling lighting

  • Special features: The implementation was not allowed to interfere with the ongoing operation in the embassy.

CONTACT US