Electrical engineering: In 2000, All Engineering installed the computer system and electronic building equipment for the Canadian Embassy in Pristina. Due to the strict safety precautions, the assembly work must take place at exceptional times.

  • Project: Canadian embassy in Pristina

  • Client: Co. Bautech GmbH

  • Project volume: Approx. 2.5 million DM

  • Construction start: July 2000

  • Construction time: 1.5 months

  • General constractor: Co. Bautech GmbH

  • All Engineering Contract: Installation of the telephone system and the EDP system.

  • Special features: Since all safety regulations had to be complied with, which did not disturb the operation of the embassy, the working hours were very exceptional.